Over the past 20 years, RPI has carried out hundreds of studies on all major segments of the oil and gas industry of Russia, CIS and Eastern Europe.
RPI specialists are permanently in close connect with the industry and monitor its developments closely to provide best-in-class analytics and information support for industry players.
RPI specialists are permanently in close connect with the industry and monitor its developments closely to provide best-in-class analytics and information support for industry players.
1 EUR = 50 RUB
Price in rubles - 172 500 RUB
Oilfield service equipment is critical to any production projects implemented by petroleum companies, and the level of technology and operating personnel’s skills have a decisive impact on production and operating costs.
This study is one in a series of RPI’s oilfield service reports designed to help concerned audiences develop a comprehensive understanding of the Russian oilfield services market.
The report focuses on fixed and mobile rigs, hydraulic fracturing pressure pumps, coil tubing systems, well servicing and workover rigs, and cementing units.
The main sections of the report provide details of the following:
- Current oilfield service equipment inventory
- Key equipment manufacturers
- Forecasts of changes in the equipment fleets based on analysis of production projects
Equipment manufacturers can glean some insights from the report regarding key growth trends in individual oilfield service equipment segments and use this knowledge in their day-to-day work.
Companies and market analysts could use the report data to develop assessments of investment attractiveness for specific projects.
Introduction
1. Key findings of the study
2. Major oil production projects
3. Drilling equipment (fixed and mobile rigs)
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
4. Hydraulic fracturing equipment (hydraulic fracturing pressure pumps)
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
5. Coil tubing systems
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
6. Well servicing/Workover rigs
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
7. Cementing units
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
1. Key findings of the study
2. Major oil production projects
3. Drilling equipment (fixed and mobile rigs)
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
4. Hydraulic fracturing equipment (hydraulic fracturing pressure pumps)
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
5. Coil tubing systems
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
6. Well servicing/Workover rigs
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
7. Cementing units
a. Equipment inventory historical data (2007-2011) and forecast for 2012-2017
b. Segmentation by manufacturer (2011)
c. SWOT analysis
d. Manufacturer profiles
Feedback
You can ask your question about report or leave your comment in a form below.
* By sending this form you agree with the Privacy policy and Processing of your personal data.